{"id":505,"date":"2009-08-04T08:56:14","date_gmt":"2009-08-04T15:56:14","guid":{"rendered":"http:\/\/holyokemass.com\/?p=505"},"modified":"2009-08-04T08:56:14","modified_gmt":"2009-08-04T15:56:14","slug":"new-church-at-holyoke","status":"publish","type":"post","link":"http:\/\/holyokemass.com\/blog\/2009\/08\/04\/new-church-at-holyoke\/","title":{"rendered":"New Church at Holyoke"},"content":{"rendered":"<p><strong>August 4, 1899, Page 3<br \/>\nAttractive Structure Being Built on Jackson Street by the German Lutheran Society.<\/strong><\/p>\n<p><strong><\/strong><\/p>\n<div id=\"attachment_507\" style=\"width: 305px\" class=\"wp-caption aligncenter\"><strong><strong><img aria-describedby=\"caption-attachment-507\" decoding=\"async\" loading=\"lazy\" class=\"size-medium wp-image-507\" title=\"1899-lutheran-church\" src=\"http:\/\/holyokemass.com\/blog\/wp-content\/uploads\/2009\/08\/1899-lutheran-church-295x300.jpg\" alt=\"German Lutheran Church at Holyoke\" width=\"295\" height=\"300\" srcset=\"http:\/\/holyokemass.com\/blog\/wp-content\/uploads\/2009\/08\/1899-lutheran-church-295x300.jpg 295w, http:\/\/holyokemass.com\/blog\/wp-content\/uploads\/2009\/08\/1899-lutheran-church.jpg 589w\" sizes=\"(max-width: 295px) 100vw, 295px\" \/><\/strong><\/strong><p id=\"caption-attachment-507\" class=\"wp-caption-text\">German Lutheran Church at Holyoke<\/p><\/div>\n<p><strong><\/strong><\/p>\n<p>The members and friends of the German Lutheran church in Holyoke are looking forward with much anticipation to the occupancy of the fine new church that is now being built to replace the old one, burned at the time of the blizzard last winter.   The plans are by G. P. B. Alderman of Holyoke, and call for a structure costing about $25,000.   It is to be built of brick, with brownstone trimmings of the usual Gothic church style, and having a spire about 130 feet in height.   A large part of the money has already been raised for the church building, which will contain seating space for 300 in the auditorium and 100 in the galleries, and under its roof will be a chapel with a seating space for 300 and rooms for the occupancy of the pastor and his family.<\/p>\n<p>The main entrance to the church will be on Jackson street, and the doors will be three in number, leading to a corridor, which in turn leads to the auditorium by three entrances.   The interior finish will be in ash.   The organ will be located in the rear of the church, and at the front will be the platform and pulpit, with anterooms on each side.   Back of the auditorium, and running at right angles to it, is the chapel, part of which can be used as a school-room.   Over this are the rooms for the use of the pastor and his family.   It is not expected that the church will be ready for occupancy until late in the fall, possibly not until December 1.<\/p>\n<p>Extracted from <em>The Springfield Republican<\/em>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>August 4, 1899, Page 3 Attractive Structure Being Built on Jackson Street by the German Lutheran Society. The members and friends of the German Lutheran church in Holyoke are looking forward with much anticipation to the occupancy of the fine new church that is now being built to replace the old one, burned at the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15,102],"tags":[732,105,144],"_links":{"self":[{"href":"http:\/\/holyokemass.com\/blog\/wp-json\/wp\/v2\/posts\/505"}],"collection":[{"href":"http:\/\/holyokemass.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/holyokemass.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/holyokemass.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/holyokemass.com\/blog\/wp-json\/wp\/v2\/comments?post=505"}],"version-history":[{"count":3,"href":"http:\/\/holyokemass.com\/blog\/wp-json\/wp\/v2\/posts\/505\/revisions"}],"predecessor-version":[{"id":550,"href":"http:\/\/holyokemass.com\/blog\/wp-json\/wp\/v2\/posts\/505\/revisions\/550"}],"wp:attachment":[{"href":"http:\/\/holyokemass.com\/blog\/wp-json\/wp\/v2\/media?parent=505"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/holyokemass.com\/blog\/wp-json\/wp\/v2\/categories?post=505"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/holyokemass.com\/blog\/wp-json\/wp\/v2\/tags?post=505"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}